FAQ Header

What is the ordering process for zedoary turmeric oil?

Ordering zedoary turmeric oil takes six simple steps: inquiry, sample evaluation, quotation, contract, production and shipment. Tell us your grade (pharmacopoeia or fragrance), quantity, destination port and required documents; we reply with a quotation within 1-2 working days and manage the whole order with one dedicated sales engineer.

Step-by-Step Process

StepWhat happensTimeframe
1. InquiryShare grade (TPS-HO-003), quantity, port, documents neededSame day
2. SampleFree 100 g-1 kg sample with COA and fingerprint1-3 working days dispatch
3. QuotationFOB/CIF price, payment terms and lead time1-2 working days
4. ContractPI with spec, packing and Incoterms signed1-2 working days
5. ProductionFilling/release under your spec, QC and full testing3-7 days (stock) / 10-20 days (production)
6. ShipmentBooking, documents, tracking sharedOn schedule

What We Need From You

  • Grade: pharmacopoeia grade (ChP 2025) or fragrance grade
  • Quantity and packing (100 g bottle, 1 kg, 25 kg drum, 180 kg drum, IBC)
  • End use and destination country so we prepare the right documents
  • Certificates needed (organic, Halal, Kosher) so we plan the audit

Key Points

  • A Proforma Invoice (PI) is issued for confirmation; no production starts without a signed PI
  • The batch number is reserved at contract signing and appears on the label, COA and documents
  • For pharmacopoeia-grade orders, the full HPLC/TLC release takes about 3-5 working days, included in the lead time

Relate Products

This article was published on 2026-09-07, and last updated on 2026-09-07. The article will be continuously updated.