What is the ordering process for zedoary turmeric oil?
Ordering zedoary turmeric oil takes six simple steps: inquiry, sample evaluation, quotation, contract, production and shipment. Tell us your grade (pharmacopoeia or fragrance), quantity, destination port and required documents; we reply with a quotation within 1-2 working days and manage the whole order with one dedicated sales engineer.
Step-by-Step Process
| Step | What happens | Timeframe |
|---|---|---|
| 1. Inquiry | Share grade (TPS-HO-003), quantity, port, documents needed | Same day |
| 2. Sample | Free 100 g-1 kg sample with COA and fingerprint | 1-3 working days dispatch |
| 3. Quotation | FOB/CIF price, payment terms and lead time | 1-2 working days |
| 4. Contract | PI with spec, packing and Incoterms signed | 1-2 working days |
| 5. Production | Filling/release under your spec, QC and full testing | 3-7 days (stock) / 10-20 days (production) |
| 6. Shipment | Booking, documents, tracking shared | On schedule |
What We Need From You
- Grade: pharmacopoeia grade (ChP 2025) or fragrance grade
- Quantity and packing (100 g bottle, 1 kg, 25 kg drum, 180 kg drum, IBC)
- End use and destination country so we prepare the right documents
- Certificates needed (organic, Halal, Kosher) so we plan the audit
Key Points
- A Proforma Invoice (PI) is issued for confirmation; no production starts without a signed PI
- The batch number is reserved at contract signing and appears on the label, COA and documents
- For pharmacopoeia-grade orders, the full HPLC/TLC release takes about 3-5 working days, included in the lead time
This article was published on 2026-09-07, and last updated on 2026-09-07. The article will be continuously updated.