What is the production lead time for this ylang ylang oil?
Ylang ylang is produced in distillation campaigns tied to the flower harvest cycle, so lead time depends on volume and whether the lot is in stock or needs fresh distillation.
Production Lead Time
| Order type | Lead time |
|---|---|
| In-stock lots (sample / small) | 1-3 working days |
| Standard bulk order (in-stock) | 5-10 working days |
| Fresh distillation | 2-4 weeks |
| Private label / certified lots | 2-4 weeks plus certification time |
- Flowering continues year-round in the tropics, but distillation campaigns follow harvest intensity in Madagascar/Comoros/Indonesia
- We maintain stock at origin to guarantee short lead times
- Lead time is confirmed in the PI; we commit to a shipment date once deposit is received
- Urgent small orders are prioritized
- For long-term projects, plan with a rolling forecast to guarantee availability
This article was published on 2026-09-07, and last updated on 2026-09-07. The article will be continuously updated.