What is the production lead time for storax balsam oil orders?
Standard production lead time is 15–30 days after deposit and sample approval; stock grades can ship in 3–5 days, and certified lots add 1–2 weeks for documentation.
Lead Time by Scenario
| Scenario | Lead time |
|---|---|
| In-stock grade (steam-distilled) | 3–5 days |
| Standard production (steam, 25–200 kg) | 15–20 days |
| Supercritical CO2 extract (new run) | 20–30 days |
| Organic / GI / Halal-certified lot | +7–14 days for certificate & segregated run |
| Custom blend / OEM pack | +5–10 days |
| Sea freight (shanghai→EU/US) | +25–40 days transit (after lead time) |
- Resin availability peaks in the defined tapping season; off-season orders may need 5–10 extra days for raw material
- We keep safety stock of the standard steam-distilled grade to guarantee 3–5 day dispatch
- Production calendar is shared weekly with contract customers (available slots & resin stock levels)
- Urgent orders (10–50 kg) can be expedited to 10 days with priority allocation at +5% surcharge
This article was published on 2026-09-07, and last updated on 2026-09-07. The article will be continuously updated.