FAQ Header

What is the production lead time for this Shennong chrysanthemum oil?

Standard production lead time is 15–30 days after deposit confirmation, depending on batch size and whether the raw material is in stock or must be distilled from the seasonal harvest.

Lead Time Overview

ScenarioLead time
In-stock standard batch7–15 days
Standard production run15–30 days
Custom / certified batch30–45 days (or seasonal)
Annual contractScheduled per harvest calendar
  • Confirmed orders are slotted into the production schedule the same week
  • Seasonal raw material is distilled and aged; large orders may require waiting for the next harvest window
  • Pre-ship inspection and documentation are included in the lead time

For time-critical projects, advise us of your deadline so we can prioritize the batch.

Relate Products

This article was published on 2026-09-07, and last updated on 2026-09-07. The article will be continuously updated.