What is the production lead time for schisandra berry oil?
Standard lead time is 15–30 days depending on grade: stock grades ship in 3–5 days; CSFE/3rd-gen premium production takes 25–30 days; certification documents add 1–4 weeks.
Lead Time Breakdown
| Order type | Lead time |
|---|---|
| Stock grade (standard SFE-CO2 / distilled) | 3–5 days |
| Standard production run | 15–20 days |
| CSFE three-stage / premium production | 25–30 days |
| Certification (halal / kosher / organic) | +1–4 weeks |
| Bulk order (100 kg+) scheduling | 30–45 days with LTA priority |
- The dominant time is SFE-CO2 extraction and HPLC/GC-MS release testing
- Autumn (Sep–Dec) is high season: place orders 2–3 months ahead for large volumes
- Urgent orders from existing stock can ship within 5 days