FAQ Header

What is the production lead time for schisandra berry oil?

Standard lead time is 15–30 days depending on grade: stock grades ship in 3–5 days; CSFE/3rd-gen premium production takes 25–30 days; certification documents add 1–4 weeks.

Lead Time Breakdown

Order typeLead time
Stock grade (standard SFE-CO2 / distilled)3–5 days
Standard production run15–20 days
CSFE three-stage / premium production25–30 days
Certification (halal / kosher / organic)+1–4 weeks
Bulk order (100 kg+) scheduling30–45 days with LTA priority
  • The dominant time is SFE-CO2 extraction and HPLC/GC-MS release testing
  • Autumn (Sep–Dec) is high season: place orders 2–3 months ahead for large volumes
  • Urgent orders from existing stock can ship within 5 days

Relate Products

This article was published on 2026-09-07, and last updated on 2026-09-07. The article will be continuously updated.