What is the production lead time for orris absolute bulk orders?
Standard production lead time is 15–30 days from confirmed order and deposit. Because the absolute is made from pre-aged rhizome reserves, most standard volumes can be fulfilled from stock or short production runs; large or certified-organic allocations follow a longer, contracted schedule.
Lead Time Summary
| Order type | Lead time |
|---|---|
| Stock grade (100 g – 1 kg) | 15–20 days |
| Production run (1 – 5 kg) | 20–30 days |
| Contract / organic (5 kg+) | Per forward contract (custom) |
- Lead time starts after PI confirmation and deposit receipt
- The 3+ year aging cycle is completed before our reserve inventory; no extra aging wait for standard orders
- Urgent small orders can be dispatched within 7–10 days if stock is available
Confirm your target arrival date and we will confirm the achievable dispatch schedule in the PI.
This article was published on 2026-09-07, and last updated on 2026-09-07. The article will be continuously updated.