What is the production lead time for a neroli oil order?
Standard lead time is 15–30 days from confirmed deposit to shipment, depending on order volume and whether the batch needs to be freshly distilled or can be drawn from stock.
Lead Time Breakdown
| Order Stage | Typical Duration |
|---|---|
| Deposit + PI confirmation | 1–2 days |
| Batch production & QC | 10–20 days |
| Packaging & labeling | 2–5 days |
| Export documentation | 1–3 days |
| Total | 15–30 days |
- Stock batches ship faster (7–10 days); freshly distilled batches follow the full schedule
- Peak-season orders (harvest window) may be slightly longer — we confirm exact dates at quotation
- A production schedule with milestone dates is issued after deposit, and status updates are sent weekly
Send your required delivery date and volume now so we can reserve capacity or stock for your schedule.