What is the production lead time for bulk orders?
Standard bulk production takes 15–30 days from deposit confirmation, plus 3–7 days for ocean transit, depending on your destination port.
Lead Time Breakdown
| Stage | Duration |
|---|---|
| Raw-flower procurement | Included in production window |
| Distillation & purification | 7–15 days |
| QC testing (GC-MS, COA) | 3–5 days |
| Packaging & labeling | 3–5 days |
| Total production | 15–30 days |
| Ocean transit | 15–35 days (by region) |
Place your order with the deposit 30–45 days before your needed shipping date to hold a fresh-season production slot.