What is the production lead time for Astragalus root oil?
Lead time depends on grade and quantity.
Lead Time by Scenario
| Scenario | Lead time |
|---|---|
| In-stock standard grade | 3–7 days after deposit |
| Standard production run | 15–30 days after deposit |
| CO2 premium / high-marker batch | 30–45 days |
| Organic-certified lot | 6–9 months (advance planning required) |
| Framework contract (25–500 kg/quarter) | Staged release as scheduled, 2–3 weeks per call-off |
- Lead time starts once the 30% deposit clears and the batch spec is confirmed (grade, markers, packaging, labeling)
- We keep safety stock of the steam-distilled standard grade for urgent orders
- For launch timelines, request a production slot at least 4 weeks ahead
This article was published on 2026-09-07, and last updated on 2026-09-07. The article will be continuously updated.